Environmental Documents

Print

 

Altitude Business Center (PL16-0456, PL16-0457, PL17-0042 & PL17-0044) 
    Initial Study 
    Notice of Preparation 

Chino Annexation Area Project - Pipeline/Chino Avenue 
    Final Initial Study/Mitigated Negative Declaration 
       Appendix A - Residential Design and Plans
       Appendix B - Air Quality and Greenhouse Gas Modeling Data
       Appendix C - Arborist Report
       Appendix D - Cultural Resources Studies
       Appendix E - Hazardous Materials Reports
       Appendix F - Hydrology and Utilities Reports
       Appendix G - Noise Impact Modeling Data
       Appendix H - Traffic Study 

Chino Francis Estates (PL16-0884, PL16-0882, PL16-0883, PL17-0068 & PL17-0069)
    Initial Study / Mitigated Negative Declaration 
    Figures 
    Appendices 
       Appendix A - Air Quality - Part 1 | Part 2 
       Appendix B - General Biological Resources Assessment 
       Appendix C - Phase 1 Cultural Resources Assessment 
       Appendix D - Geotechnical Investigation 
       Appendix E - Greenhouse Gas 
       Appendix F - Phase I and Phase II Environmental Site Assessment - Part 1 | Part 2 
       Appendix G - Hydrology 
          Preliminary Hydrology Study 
          Preliminary Water Quality Management Plan - Part 1 | Part 2 
       Appendix I - Traffic Impact Analysis 
       Appendix J - Yorba-Francis 4-Way Stop Warrant Analysis 
       Response to Comments 

Chino Parcel Delivery Facility 
     Initial Study 
     Notice of Preparation 

Chino RV Storage Facility 
     Recirculated Draft Environmental Impact Report 

Euclid Commerce Center (PL16-0701; PL16-0702; PL16-0703; & PL17-0048) 
    Addendum to EIR 
    Appendix A - Mitigation Monitoring and Reporting Program 
    Appendix B - Air Quality and Greenhouse Gas Evaluation 
    Appendix C - Biotics Resources Report 
    Appendix D - Cultural Resources Evaluation Report 
    Appendix E - Geotechnical Investigation 
    Appendix F - Environmental Site Assessment 
    Appendix G - Hydrology and Water Quality Analyses 
       Part 1 | Part 2 | Part 3 | Part 4 
    Appendix H - Noise Impact Analysis 
    Appendix I - Traffic Impact Study 

Rancho Miramonte Environmental Impact Report Addendum (PL12-0467 & PL12-0469)
    Addendum to EIR
       Appendix A - 2009 Certified EIR
       Appendix B - 2008 Agricultural Resources
       Appendix C - 2008 Air Quality Analysis
       Appendix D - 2007-2008 Biological Resource Assessments - Part 1 | Part 2
       Appendix E - 2007 Cultural Resources Assessments
       Appendix F - 2007 Geotechnical Assessment
       Appendix G - 2004-2008 Environmental Site Assessments
       Appendix H - 2008 Hydrology and Water Quality Technical Report
       Appendix I - 2007 Noise Modeling
       Appendix J - 2007 Traffic Impact Analysis
       Appendix K - 2015 and 2016 Transportation Assessments
       Appendix L - 2007 Public Utilities and Service Systems - Part 1 | Part 2 | Part 3
       Appendix M - 2016 Water System Master Plan and 2015 Sewer Master Plan
       Appendix N - 2008 Climate Change Analysis
       Appendix O - 2011 City of Chino GHG Settlement Agreement
       Appendix P - 2015 Hydrology Master Plan and Preliminary WQMP
          Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6
       Appendix Q - 2016 Water Supply Assessment  

Addendum to the Preserve Chino Sphere of Influence - Sub-Area 2 for the Harvest At The Preserve Residential Project
    Table of Contents
    Section 1 - Introduction
    Section 2 - Project Description
    Section 3 - Comparison of Impacts
    Section 4 - Summary of Impact Conclusions
    Section 5 - References
    Appendix A - Mitigation Monitoring Program
    Appendix B - Hydrology Study and Draft Water Quality Management Plan
    Appendix C - Biology/Regulatory Assessment
    Appendix D - Phase 1 Environmental Site Assessment
        Part 1 | Part 2 | Part 3 | Part 4 | Part 5
    Appendix E - Traffic Impact Analysis
        Part 1 | Part 2 | Part 3 | Part 4 | Part 5
    Appendix F - Air Quality and Greenhouse Gas Emissions Calculations
    Development Agreement Addendum No. 2
    (Link to Preserve EIR)

Addendum to the Preserve Chino Sphere of Influence - Subarea 2 Environmental Impact Report for the South of Pine and Flores Project 
    Addendum Cover Page and Table of Contents 
    Section 1 - Introduction 
    Section 2 - Project Description 
    Sections 3 - Comparison of Impacts, 4 - Summary of Impact Conclusions, and 5 - References 
       Appendix A - Mitigation Monitoring Program 
       Appendix B - Water Quality Management Plans: Part 1 | Part 2 
       Appendix C - Biological and Regulatory Assessment 
       Appendix D - Traffic Impact Analysis: Part 1 | Part 2 | Part 3  
       Appendix E - Acoustical Analysis 
       Appendix F - Air Quality and Greenhouse Gas Emissions Calculations 
       Appendix G - Water Demand Memorandum 

Falloncrest At The Preserve
    Final Environmental Impact Report
        Appendix A - Focused Traffic Impact Analysis
        Appendix B - Technical Consultant Letters
        Appendix C - Revised Traffic Impact Analysis | Appendices
        Appendix D - Water Supply Assessment
    Initial Study   
    Draft Environmental Impact Report
       00 - Table of Contents (2.98 MB)
       Section 01 - Executive Summary (729 KB)
       Section 02 - Introduction (360 KB)
       Section 03 - Project Description (4.44 MB)
       Section 04a - Environmental Impact Analysis, Parts 4.1-4.8 (17.4 MB)
       Section 04b - Environmental Impact Analysis, Parts 4.9-4.10 (6.89 MB)
       Section 05 - Other CEQA Considerations (1.68 MB)
       Section 06 - Acronyms and Abbreviations (280 KB)
       Section 07 - References (276 KB)
       Appendix A - Initial Study, NOP, and NOP Responses
          Initial Study - See above
          Notice of Preparation (NOP) (6.16 MB)
          NOP Responses (3.58 MB)
       Appendix B - Preserve Master Plan EIR
          (Link to Preserve Specific Plan and EIR)
          Community Core Master Plan and Overall Design Concept (18.5 MB)
          Falloncrest Master Plan and Overall Design Concept
             Part 1 (19.1 MB)  |  Part 2 (18.3 MB)  |  Part 3 (14.6 MB)  |
             Part 4 (14.7 MB)  |  Part 5 (17.8 MB)  |  Part 6 (19.4 MB)  |  Part 7 (17.8 MB)
       Appendix C - Traffic Impact Study
          Report - Part 1 (19.6 MB) | Report - Part 2 (14.1 MB)
          Appendices (11.1 MB)
       Appendix D - Air Quality Impact Analyses
          Air Quality Analysis (2.26 MB) | Greenhouse Gas Analysis (2.51 (MB)
       Appendix E - Noise Impact Analysis - Report (3.33 MB) | Appendices (4.96 MB)
       Appendix F - Environmental Site Assessments
          Subsurface Methane Gas Investigation (6.79 MB)
          Results of Soil Pesticide Screening Survey - June 2011 (5.48 MB)
          Results of Soil Pesticide Screening Survey - Updated August 2013 (11.5 MB)
          Environmental Site Assessment - Part A (10.5 MB)  |  Part B (12.2 MB)  |  Part C (19.3 MB)
       Appendix G - Stormwater Management
          Subarea 2 Natural Treatment System Plan (3.63 MB)
          Urban Runoff Management Plan (1.00 MB)
          Hydrology Report (12.7 MB)
          Water Quality Management Plan - Part A (14.2 MB)  |  Part B (11.9 MB)  |  Part C (10.8 MB)
       Appendix H - Biological Resources Assessments (1.75 MB)
       Appendix I - Agricultural Resources Assessments (1.06 MB)
       Appendix J - Water Service Agreement (2.90 MB)

Richland Communities - Addendum to Environmental Impact Report (PL16-0491 and PL16-0490) 
    EIR Addendum 
    Appendix A - Air Quality & Greenhouse Gas Assessment 
    Appendix B - Biological Resources Report 
    Appendix C - Cultural Resources Survey 
    Appendix D - Geotechnical Investigation 
    Appendix E - Phase I Environmental Site Assessment 
    Appendix F - Preliminary Drainage Study 
    Appendix G - Preliminary Water Quality Management Plan 
    Appendix H - Noise Impact Analysis 
    Appendix I - Traffic Impact Analysis 

Watson Industrial Park
    Cover
    Table of Contents
    Section S.0 - Executive Summary
    Section 1.0 - Introduction
    Section 2.0 - Environmental Setting
    Section 3.0 - Project Description
    Section 4.0 - Environmental Analysis
    Section 4.1 - Aesthetics
    Section 4.2 - Agriculture and Forestry
    Section 4.3 - Air Quality
    Section 4.4 - Biological Resources
    Section 4.5 - Cultural Resources
    Section 4.6 - Geology and Soils
    Section 4.7 - Greenhouse Gas Emissions
    Section 4.8 - Hazards and Hazards Materials
    Section 4.9 - Hydrology and Water Quality
    Section 4.10 - Land Use Planning
    Section 4.11 - Noise
    Section 4.12 - Public Services
    Section 4.13 - Transportation - Part 1 | Part 2
    Section 4.14 - Utilities and Service Systems
    Section 5.0 - Other CEQA Considerations
    Section 6.0 - Alternatives
    Section 7.0 - References
    Section F.0 - Final Environmental Impact Report
    Appendix A - Initial Study, Notice of Preparation, and Written Comments on the NOP
    Appendix B - Agricultural Resources Assessment
    Appendix C1 - Air Quality Impact Analysis
    Appendix C2 - Mobile Sources Health Risk Assessment
    Appendix D - Biological Technical Report
    Appendix E1 - Paleontological Resources Assessment
    Appendix E2 - Archaeological Resources Assessment
    Appendix E3 - Historical Resources Assessment
    Appendix F1 - Geotechnical Feasibility Study
    Appendix F2 - Geotechnical Feasibility Study
    Appendix F3 - Geotechnical Feasibility Study
    Appendix F4 - Geotechnical Investigation
    Appendix G - Greenhouse Gas Analysis
    Appendix H1 - Phase I Environmental Site Assessment
    Appendix H2 - Phase II Environmental Site Assessment
    Appendix H3 - Supplemental Phase II Environmental Site Assessment
    Appendix H4 - Phase II Environmental Site Assessment
    Appendix H5 - Supplemental Phase II Environmental Site Assessment
    Appendix H6 - Phase I Environmental Site Assessment and Phase II Soil Quality Investigation
    Appendix H7 - Phase I Environmental Site Assessment and Phase II Soil Quality Investigation
    Appendix I1 - Hydrology Report
    Appendix I2 - Water Quality Management Plan
    Appendix I3 - Water Quality Management Plan Addendum
    Appendix J - Noise Impact Analysis
    Appendix K1 - CVIFD Service Availability Letter
    Appendix K2 - CPD Service Availability Letter
    Appendix L1 - Traffic Impact Analysis - Part 1 | Part 2 | Part 3 | Part 4 | Part 5
    Appendix L2 - Supplemental Basic Freeway Segment Analysis
    Appendix L3 - Supplemental Traffic Analysis
    Appendix L4 - Supplemental Mitigation Memo
    Appendix M - Water Supply Assessment
    Appendix N - Energy Analysis Report
    Appendix O - Written Correspondence 

For more information, please contact the Community Development Department at (909)334-3314 or email to communitydevelopment@cityofchino.org.