Environmental Documents

Print

 

Altitude Business Center (PL16-0456, PL16-0457, PL17-0042 & PL17-0044) 
    Initial Study 
    Notice of Preparation 

Chino Annexation Area Project - Pipeline/Chino Avenue 
    Final Initial Study/Mitigated Negative Declaration 
       Appendix A - Residential Design and Plans
       Appendix B - Air Quality and Greenhouse Gas Modeling Data
       Appendix C - Arborist Report
       Appendix D - Cultural Resources Studies
       Appendix E - Hazardous Materials Reports
       Appendix F - Hydrology and Utilities Reports
       Appendix G - Noise Impact Modeling Data
       Appendix H - Traffic Study 

Chino Francis Estates (PL16-0884, PL16-0882, PL16-0883, PL17-0068 & PL17-0069)
    Initial Study / Mitigated Negative Declaration 
    Figures 
    Appendices 
       Appendix A - Air Quality - Part 1 | Part 2 
       Appendix B - General Biological Resources Assessment 
       Appendix C - Phase 1 Cultural Resources Assessment 
       Appendix D - Geotechnical Investigation 
       Appendix E - Greenhouse Gas 
       Appendix F - Phase I and Phase II Environmental Site Assessment - Part 1 | Part 2 
       Appendix G - Hydrology 
          Preliminary Hydrology Study 
          Preliminary Water Quality Management Plan - Part 1 | Part 2 
       Appendix I - Traffic Impact Analysis 
       Appendix J - Yorba-Francis 4-Way Stop Warrant Analysis 
       Response to Comments 
       Development Plans - Part 1 | Part 2 | Part 3 | Part 4 

Chino Parcel Delivery Facility 
     Initial Study 
     Notice of Preparation 

Chino RV Storage Facility 
     Recirculated Draft Environmental Impact Report
     Recirculated Final Environmental Impact Report (Response to Comments)
     Previously Certified Environmental Impact Report

Euclid Commerce Center (PL16-0701; PL16-0702; PL16-0703; & PL17-0048) 
    Addendum to EIR 
    Appendix A - Mitigation Monitoring and Reporting Program 
    Appendix B - Air Quality and Greenhouse Gas Evaluation 
    Appendix C - Biotics Resources Report 
    Appendix D - Cultural Resources Evaluation Report 
    Appendix E - Geotechnical Investigation 
    Appendix F - Environmental Site Assessment 
    Appendix G - Hydrology and Water Quality Analyses 
       Part 1 | Part 2 | Part 3 | Part 4 
    Appendix H - Noise Impact Analysis 
    Appendix I - Traffic Impact Study 

Rancho Miramonte Environmental Impact Report Addendum (PL12-0467 & PL12-0469)
    Addendum to EIR
       Appendix A - 2009 Certified EIR
       Appendix B - 2008 Agricultural Resources
       Appendix C - 2008 Air Quality Analysis
       Appendix D - 2007-2008 Biological Resource Assessments - Part 1 | Part 2
       Appendix E - 2007 Cultural Resources Assessments
       Appendix F - 2007 Geotechnical Assessment
       Appendix G - 2004-2008 Environmental Site Assessments
       Appendix H - 2008 Hydrology and Water Quality Technical Report
       Appendix I - 2007 Noise Modeling
       Appendix J - 2007 Traffic Impact Analysis
       Appendix K - 2015 and 2016 Transportation Assessments
       Appendix L - 2007 Public Utilities and Service Systems - Part 1 | Part 2 | Part 3
       Appendix M - 2016 Water System Master Plan and 2015 Sewer Master Plan
       Appendix N - 2008 Climate Change Analysis
       Appendix O - 2011 City of Chino GHG Settlement Agreement
       Appendix P - 2015 Hydrology Master Plan and Preliminary WQMP
          Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6
       Appendix Q - 2016 Water Supply Assessment  

Addendum to the Preserve Chino Sphere of Influence - Sub-Area 2 for the Harvest At The Preserve Residential Project
    Table of Contents
    Section 1 - Introduction
    Section 2 - Project Description
    Section 3 - Comparison of Impacts
    Section 4 - Summary of Impact Conclusions
    Section 5 - References
    Appendix A - Mitigation Monitoring Program
    Appendix B - Hydrology Study and Draft Water Quality Management Plan
    Appendix C - Biology/Regulatory Assessment
    Appendix D - Phase 1 Environmental Site Assessment
        Part 1 | Part 2 | Part 3 | Part 4 | Part 5
    Appendix E - Traffic Impact Analysis
        Part 1 | Part 2 | Part 3 | Part 4 | Part 5
    Appendix F - Air Quality and Greenhouse Gas Emissions Calculations
    Development Agreement Addendum No. 2
    (Link to Preserve EIR)

Addendum to the Preserve Chino Sphere of Influence - Subarea 2 Environmental Impact Report for the South of Pine and Flores Project 
    Addendum Cover Page and Table of Contents 
    Section 1 - Introduction 
    Section 2 - Project Description 
    Sections 3 - Comparison of Impacts, 4 - Summary of Impact Conclusions, and 5 - References 
       Appendix A - Mitigation Monitoring Program 
       Appendix B - Water Quality Management Plans: Part 1 | Part 2 
       Appendix C - Biological and Regulatory Assessment 
       Appendix D - Traffic Impact Analysis: Part 1 | Part 2 | Part 3  
       Appendix E - Acoustical Analysis 
       Appendix F - Air Quality and Greenhouse Gas Emissions Calculations 
       Appendix G - Water Demand Memorandum 

Falloncrest At The Preserve
    Final Environmental Impact Report
        Appendix A - Focused Traffic Impact Analysis
        Appendix B - Technical Consultant Letters
        Appendix C - Revised Traffic Impact Analysis | Appendices
        Appendix D - Water Supply Assessment
    Initial Study   
    Draft Environmental Impact Report
       00 - Table of Contents (2.98 MB)
       Section 01 - Executive Summary (729 KB)
       Section 02 - Introduction (360 KB)
       Section 03 - Project Description (4.44 MB)
       Section 04a - Environmental Impact Analysis, Parts 4.1-4.8 (17.4 MB)
       Section 04b - Environmental Impact Analysis, Parts 4.9-4.10 (6.89 MB)
       Section 05 - Other CEQA Considerations (1.68 MB)
       Section 06 - Acronyms and Abbreviations (280 KB)
       Section 07 - References (276 KB)
       Appendix A - Initial Study, NOP, and NOP Responses
          Initial Study - See above
          Notice of Preparation (NOP) (6.16 MB)
          NOP Responses (3.58 MB)
       Appendix B - Preserve Master Plan EIR
          (Link to Preserve Specific Plan and EIR)
          Community Core Master Plan and Overall Design Concept (18.5 MB)
          Falloncrest Master Plan and Overall Design Concept
             Part 1 (19.1 MB)  |  Part 2 (18.3 MB)  |  Part 3 (14.6 MB)  |
             Part 4 (14.7 MB)  |  Part 5 (17.8 MB)  |  Part 6 (19.4 MB)  |  Part 7 (17.8 MB)
       Appendix C - Traffic Impact Study
          Report - Part 1 (19.6 MB) | Report - Part 2 (14.1 MB)
          Appendices (11.1 MB)
       Appendix D - Air Quality Impact Analyses
          Air Quality Analysis (2.26 MB) | Greenhouse Gas Analysis (2.51 (MB)
       Appendix E - Noise Impact Analysis - Report (3.33 MB) | Appendices (4.96 MB)
       Appendix F - Environmental Site Assessments
          Subsurface Methane Gas Investigation (6.79 MB)
          Results of Soil Pesticide Screening Survey - June 2011 (5.48 MB)
          Results of Soil Pesticide Screening Survey - Updated August 2013 (11.5 MB)
          Environmental Site Assessment - Part A (10.5 MB)  |  Part B (12.2 MB)  |  Part C (19.3 MB)
       Appendix G - Stormwater Management
          Subarea 2 Natural Treatment System Plan (3.63 MB)
          Urban Runoff Management Plan (1.00 MB)
          Hydrology Report (12.7 MB)
          Water Quality Management Plan - Part A (14.2 MB)  |  Part B (11.9 MB)  |  Part C (10.8 MB)
       Appendix H - Biological Resources Assessments (1.75 MB)
       Appendix I - Agricultural Resources Assessments (1.06 MB)
       Appendix J - Water Service Agreement (2.90 MB)

Richland Communities - Addendum to Environmental Impact Report (PL16-0491 and PL16-0490) 
    EIR Addendum 
    Appendix A - Air Quality & Greenhouse Gas Assessment 
    Appendix B - Biological Resources Report 
    Appendix C - Cultural Resources Survey 
    Appendix D - Geotechnical Investigation 
    Appendix E - Phase I Environmental Site Assessment 
    Appendix F - Preliminary Drainage Study 
    Appendix G - Preliminary Water Quality Management Plan 
    Appendix H - Noise Impact Analysis 
    Appendix I - Traffic Impact Analysis 

Watson Industrial Park
    Cover
    Table of Contents
    Section S.0 - Executive Summary
    Section 1.0 - Introduction
    Section 2.0 - Environmental Setting
    Section 3.0 - Project Description
    Section 4.0 - Environmental Analysis
    Section 4.1 - Aesthetics
    Section 4.2 - Agriculture and Forestry
    Section 4.3 - Air Quality
    Section 4.4 - Biological Resources
    Section 4.5 - Cultural Resources
    Section 4.6 - Geology and Soils
    Section 4.7 - Greenhouse Gas Emissions
    Section 4.8 - Hazards and Hazards Materials
    Section 4.9 - Hydrology and Water Quality
    Section 4.10 - Land Use Planning
    Section 4.11 - Noise
    Section 4.12 - Public Services
    Section 4.13 - Transportation - Part 1 | Part 2
    Section 4.14 - Utilities and Service Systems
    Section 5.0 - Other CEQA Considerations
    Section 6.0 - Alternatives
    Section 7.0 - References
    Section F.0 - Final Environmental Impact Report
    Appendix A - Initial Study, Notice of Preparation, and Written Comments on the NOP
    Appendix B - Agricultural Resources Assessment
    Appendix C1 - Air Quality Impact Analysis
    Appendix C2 - Mobile Sources Health Risk Assessment
    Appendix D - Biological Technical Report
    Appendix E1 - Paleontological Resources Assessment
    Appendix E2 - Archaeological Resources Assessment
    Appendix E3 - Historical Resources Assessment
    Appendix F1 - Geotechnical Feasibility Study
    Appendix F2 - Geotechnical Feasibility Study
    Appendix F3 - Geotechnical Feasibility Study
    Appendix F4 - Geotechnical Investigation
    Appendix G - Greenhouse Gas Analysis
    Appendix H1 - Phase I Environmental Site Assessment
    Appendix H2 - Phase II Environmental Site Assessment
    Appendix H3 - Supplemental Phase II Environmental Site Assessment
    Appendix H4 - Phase II Environmental Site Assessment
    Appendix H5 - Supplemental Phase II Environmental Site Assessment
    Appendix H6 - Phase I Environmental Site Assessment and Phase II Soil Quality Investigation
    Appendix H7 - Phase I Environmental Site Assessment and Phase II Soil Quality Investigation
    Appendix I1 - Hydrology Report
    Appendix I2 - Water Quality Management Plan
    Appendix I3 - Water Quality Management Plan Addendum
    Appendix J - Noise Impact Analysis
    Appendix K1 - CVIFD Service Availability Letter
    Appendix K2 - CPD Service Availability Letter
    Appendix L1 - Traffic Impact Analysis - Part 1 | Part 2 | Part 3 | Part 4 | Part 5
    Appendix L2 - Supplemental Basic Freeway Segment Analysis
    Appendix L3 - Supplemental Traffic Analysis
    Appendix L4 - Supplemental Mitigation Memo
    Appendix M - Water Supply Assessment
    Appendix N - Energy Analysis Report
    Appendix O - Written Correspondence 

For more information, please contact the Development Services Department at (909)334-3314 or email to developmentservices@cityofchino.org.